INVITATION FOR APPOINTMENT OF SUB-CONTRACTORS
PROJECTS > WORK-IN-PROGRESS

Continuous improvement, sustained growth and a passion for achieving versatility in projects handled are two benchmarks that have helped Metcon Infrastructure maintain the lead in bagging both, prestigious and challenging projects in Power, Infrastructure and Realty sectors.

Some of Our Upcoming Developments are Listed here Under

  • CSTPS Expansion Project (2 x 250MW)

    Providing BG Railway Siding Work (Part A) at Chandrapur Site, for Maharashtra for Maharashtra State Power Generation Co. Ltd. in association with M/s. Kalindee Rail Nirman (Engineers) Ltd.

  • Container Corporation Of India Ltd. (CCIL)

    Metcon bags an order for Supply of P. Way Material, Laying & Linking of Railway Track at Inland Container Depot (ICD), Raipur from Container Corporation Of India Ltd.

    Metcon bags an order for Supplying of P. Way Materials, Track ballast, lying and linking of Railway track including earth work, GSBC & RCC for ballast less track work of CONCOR Railway Siding for Proposed Multi Modal Logistic Park (MMLP) at Visakhapatnam

    Metcon bags an order for Earthwork in formation in connection with development of MMLP at Visakhapatnam

  • Gujarat State Electricity Corporation Ltd. (GSECL)

    Metcon bags an order for Providing and Laying additional Rail Track Lines from Gujarat State Electricity Corporation Ltd. at TPS-Sikka, Jamnagar, Gujarat .

    Metcon bags an order Biennial Rate contract for maintenance of Railway track for GSECL Railway Siding from Songadh to Ukai at Ukai TPS.

  • Rites Ltd.

    Metcon bags an order for Laying of Track on straight and curve including points & crossing, supply of track ballast, P. way fittings and other ancillary works in connection with construction of coal transportation system for Muzaffarpur Thermal Power Project, Stage-II (2 x 195 MW).

  • Delhi Metro Rail Corporation Ltd. (DMRC)

    Metcon bags an order for Contract CC-95: Construction of viaduct, roof portal and finishing works for automatic walkway/travelators at Dhaula Kuan and Rajouri Garden interchange Stations of line -7 of Phase – III Delhi MRTS.

  • INVITATION FOR APPOINTMENT OF SUB-CONTRACTORS